Piping Works

Full-scope piping renewals, pressure testing, and modifications. Executed by long-standing subcontractors.

FILE / IZT

Live operation, Tuzla · Izmir · Iskenderun · Mersin

  • Coverage

    Tuzla · Izmir · Iskenderun · Mersin

  • Class societies

    DNV · BV · LR · ABS · RINA · NK

  • Project lead

    Single point of accountability, end to end

  • Delivery format

    Photo report + class dossier + warranty

Scope

Detailed scope of work

17 line items

  • Dismantling cracked / bended / leaking / decomposed pipes per class marking
  • Manufacturing new isometric pipes in workshop
  • NDT control in workshop and at fitting place on board
  • Pressure and operation testing before delivery
  • Bilge water, ballast water, CO2, fire, fuel oil, diesel oil systems
  • Lube oil, cooling water, fresh water, domestic water systems
  • Airvent, sounding, scupper, draining systems
  • Steam, thermal oil, washing, tank cleaning systems
  • Inert gas & nitrogen, foam, hydraulic systems
  • Cargo lines, Framo special pipe lines, chemical tanker cargo pipes
  • Pipe materials: black, GRP, stainless steel, CuNiFe, galvanized, aluminium, hydraulic
  • BWTS retrofit: 3D scanning, design & engineering for ballast water treatment systems
  • Scrubber (EGCS) installation for main engines, auxiliary engines and boilers
  • Material supply, workshop manufacturing, on-board assembly
  • BWTS retrofit while the vessel is sailing, no delay / loss of hire
  • Class approval package coordination for BWTS and scrubber systems
  • Commissioning with maker attendance + crew familiarization

Process

Delivery protocol

  1. 01

    Stage 01

    Survey

    Existing system trace and condition report.

  2. 02

    Stage 02

    Prefab

    Off-vessel fabrication where possible to minimize downtime.

  3. 03

    Stage 03

    Install

    On-vessel installation and tie-in.

  4. 04

    Stage 04

    Test

    Pressure test, NDE, class attendance if required.

Operations

Documented field operations, captured on site, unedited.