— Service
Newbuilding
New ship construction, project management, classification-approved build, outfitting, and commissioning. Single point of accountability from design to delivery.

Live operation, Tuzla · Izmir · Iskenderun · Mersin
Coverage
Tuzla · Izmir · Iskenderun · Mersin
Class societies
DNV · BV · LR · ABS · RINA · NK
Project lead
Single point of accountability, end to end
Delivery format
Photo report + class dossier + warranty
Scope
Detailed scope of work
12 line items
- Full new-build project management, from contract to delivery
- Class-approved design coordination (DNV, BV, LR, ABS, RINA, NK)
- Hull construction: keel laying, block assembly, weld acceptances
- Piping system fabrication and installation, fuel, ballast, fire, hydraulic, sea water
- Main engine, generator, auxiliary machinery installation and alignment
- Shaft line setup, propeller fitting, rudder systems
- Electrical wiring, main switchboard, automation, navigation/communication systems
- Outfitting, accommodation, galley, fire-fighting, HVAC
- Blasting, primer and topcoat painting (class + IMO standards)
- Harbour and sea trials, full-system commissioning
- Class + flag-state certification, delivery dossier
- Warranty period follow-up and rectification works
Process
Delivery protocol
- 01
Stage 01
Design
Detailed engineering to contract specification, class pre-approval.
- 02
Stage 02
Build
Block fabrication, keel laying, weld and assembly with certified crews.
- 03
Stage 03
Outfit
Piping, machinery, electrical, accommodation, integrated installation.
- 04
Stage 04
Commission
Harbour and sea trials, class delivery, owner training.
Operations
Documented field operations, captured on site, unedited.
Related capabilities
Hull plating, structural repairs, shell expansion drawings, classification-approved welding.
Main engine overhauls, auxiliary machinery, propulsion system works. Verified procedures, documented results.
Full-scope piping renewals, pressure testing, and modifications. Executed by long-standing subcontractors.
