MAIN ENGINE & GENERATORS

Maintenance and renewal if need following work items

  • Overhauling, cleaning, inspecting, maintenance, decarbonisationing, renewing if need, testing, crack testings, before & after measurement and reporting and reassembling after finishing of all works with vessel supplied seals & o-rings and operation testing & delivering to the vessel:
  • Cylinder head (Valve rotator, valve spring, inlet valve, rocker arm, exhaust valve)
  • Exhaust manifold
  • Piston, piston ring, piston pin
  • Connecting rod
  • Liner
  • Push rod, push rod roller
  • Cam shaft
  • Crank bearing, Crank shaft main bearing, tie bolts
Z

Other special works on engine

  • Liner honing
  • Crank machining
  • Piston reconditioning
  • Inlet&outlet valves welding and machining
  • Cover machining
  • Cover, piston and liner renewal
  • Crank renewal
  • Block renewal
  • Complete main engine & generator renewal

Other maintenance works on engine

  • Air cooler
  • Turbo charger
  • Gavernor
  • Fuel pumps
  • Oil pump
  • Cleaning of carter and sump tank