MAIN ENGINE & GENERATORS
Maintenance and renewal if need following work items
- Overhauling, cleaning, inspecting, maintenance, decarbonisationing, renewing if need, testing, crack testings, before & after measurement and reporting and reassembling after finishing of all works with vessel supplied seals & o-rings and operation testing & delivering to the vessel:
- Cylinder head (Valve rotator, valve spring, inlet valve, rocker arm, exhaust valve)
- Exhaust manifold
- Piston, piston ring, piston pin
- Connecting rod
- Liner
- Push rod, push rod roller
- Cam shaft
- Crank bearing, Crank shaft main bearing, tie bolts
Other special works on engine
- Liner honing
- Crank machining
- Piston reconditioning
- Inlet&outlet valves welding and machining
- Cover machining
- Cover, piston and liner renewal
- Crank renewal
- Block renewal
- Complete main engine & generator renewal
Other maintenance works on engine
- Air cooler
- Turbo charger
- Gavernor
- Fuel pumps
- Oil pump
- Cleaning of carter and sump tank